
12' AquaDam® placed in the canal to de-water the work area.



Sand bags and a sand berm were placed to stop any seepage coming through.


The AquaDam® has been in place for 4 months, and controlling a water depth of 8'



12' AquaDam® placed in the canal to de-water the work area.
Sand bags and a sand berm were placed to stop any seepage coming through.
The AquaDam® has been in place for 4 months, and controlling a water depth of 8'