Paddle boat that used to be available.
																							 
													AquaDam® on site at the boat launch. The docks must be removed first.
																							 
													Aqua Dam Inc. employee, checking mud/water depths prior to installation. Checking mud/water depth must be done prior to ordering an AquaDam.
																							 
													Aqua Dam Inc. employee continuing to check entire area prior to installation determining the outer limits of where the AquaDam® can be placed.
																							 
													Continuing to check mud/water depths to determine the best place for the AquaDam® to lay.
																							 
													Dock must be removed prior to AquaDam® installation.
																							 
													Docks are being removed.
																							 
													Deployment of the AquaDam, the starting bank must be greater than the maximum height of the fully filled AquaDam® along it's given path for a single closed end (SCE) AquaDam.
																							 
													The single closed end (SCE) AquaDam® has a starting bank that has a 90 degree angle. The AquaDam® should be pleated and stuffed into the angle to help prevent seepage.
																							 
													AquaDam® fully deployed prior to dewatering.
																							 
													Another view of the AquaDam® fully deployed prior to dewatering.
																							 
													Last photo of AquaDam® fully deployed prior to dewatering. Unfortunately Aqua Dam Inc. does not always get to be around during dewatering.










