One 7' high x 100' long AquaDam® was installed to control 6' of water to dewater a boat ramp. Installation time was 4 hours. Repairs to the boat ramp were completed within 36 hours.
The work area is dewatered. Sump pumps are kept on site to control seepage from under the AquaDam® through the ground.
The work area is dewatered, and you will notice how tall the AquaDam® is compared to the person in the picture.
Equipment starting to grade work area to prepare installing boat ramp.
The 7 ft tall 14 ft wide (when filled) AquaDam® is being supported on the internal perimeter with fill material. This AquaDam® is a non baffled unit.