Jacoby Creek Bank Washout, Isolation with AquaDams

Initially, a 4ft tall, 15ft long Double Closed End AquaDam was installed on the creek-side of the breached creek bank wall. However, 2 days later, the City ordered a 12ft tall AquaDam to fill in the scour hole on the field side of the breached creek bank wall. A 5ft tall AquaDam was installed before the 12ft dam, to force the 12ft dam into the breach. ...